Wednesday, February 25, 2015

The construction of a new tunnel in Warsaw. There will be difficulties – Onet.pl

 
  Photo: ZMID / Press Releases
 
 
  This will be a new tunnel
 
 
 

On Friday, February 27, about h. 22, the start of the first changes in traffic, associated with the construction of the tunnel in Miedzylesiu and streets leading to it. – In the first stage, which will last until the end of the year, closed to traffic will ul. Zwoleńska, the toll for the Patriots and ul. Ant on the lengths of approx. 150 m, on both sides of the intersection of the street. Zwoleńska. At the closed portions of streets pedestrian traffic will be allowed access to the property and – informs Road Investments Management, which is responsible for this work.

Photo: Press Releases Detour intersection – Zwoleńska / Ant

This is the first phase of the work. Changes in the organization of the construction will drogowcom underground installations – sewer, water, gas and telecommunication networks and the new crossroads and sections of streets. This work will continue until the end of the year.

The tour will be led through the streets Zwoleńska: Szpotański, Lucerne, Duct Lublin. Closed fragment ul. Ant will be able to tour the street. Patriots and then ul. ODesk in the opposite direction – a paved street with no name (located south of st. Odessa) and st. Patriots. That way no name, and the Odessa will be one-way – with the direction of the Odessa drive west of the Patriots, the second street – to the east.

will also be changes in public transport. From February 28 bus line 147 will end butterfly loop courses. And the bus lines 213, 219 and 305 mobile service routes will run through the streets of the Patriots and Lucerne.

Starting next stage works, which will include street. Żegańska from the street. Patriots to M. Pożaryskiego, scheduled for April. Grade-separated crossing of the tracks will be ready by the end of next year.

Photo: Press Releases Upgrading over streets – Zwoleńska and Żegańska

Drive through the railway tracks at the station Warszawa Międzylesie is a real nightmare for drivers. During peak hours, traffic firewalls are lowered at approx. 10 minutes. (More or less with such frequency trains run) and then it is difficult to move around the surrounding streets. Cars waiting for the opening of barriers to effectively block the move. Therefore, the above-mentioned will be built 80-meter tunnel on the tracks, which will help drivers navigate through this part of town.

Today, it is well understood that it will be in place, because at. Have been painstakingly cleared trees and demolished part of the buildings. There will be two new roundabouts at intersections Zwoleńska and Mrówcza and Żegańskiej and the Station. In contrast Street roundabout. Pożaryskiego will be rebuilt. New episodes streets Żegańskiej Zwoleńska and will be located north of the railway tracks pass through, while the existing fragment Zwoleńska from Mrówcza to the Patriots and ul. Żegańskiej, from the Station to Szpotański, will serve as local roads.

All work to be completed in November 2016. Perform be selected in the tender Strabag. The cost of the investment is 87 million zł.

(bs)

LikeTweet

No comments:

Post a Comment